Installation - Post Base

ABW

Installation

Installation
  • Place the base washer and nut  on the anchor bolt, loosely fasten the nut.
  • Place the stand off base and  then the post in the ABW and  fasten on three vertical sides.
  • Make any necessary adjustments to post placements and tighten the nut anchor securely.
  • Bend up the fourth side of the ABW and fasten.
  • Not recommended when the top of post/column is not restrained (e.g. fence post).