Installation - Heavy Duty Elevated Post Base

PBH

Installation

Installation
  • Use the flitch plate to mark and drill the 8mm diameter holes for the dowels
  • Cut a 9mm slot in the side adjacent to the drilled holes, for the flitch plate
  • Fix to the foundation with M12 anchors
  • Lower the post onto the flitch plate, align the holes and fit the dowels
  • Not recommended when the top of post/column is not restrained (e.g. fence post)
  • Stainless steel option available to order
  • Heavy Duty Elevated Post Base
  • Heavy Duty Elevated Post Base
  • Heavy Duty Elevated Post Base
  • Heavy Duty Elevated Post Base