Installation - Skewed 45° hanger (right and left)

ET

Installation

Fasteners on header

Wood substrate:

  • CNA annular ring-shank nails dia. 4.0 x 35 mm.

Steel substrate:

  • Bolts dia. 12 mm (bolt diameter cannot be more than 2 mm smaller than the drill hole diameter).

Concrete substrate:

  • Mechanical anchor (dia. 12 mm: WA M10-78/5).
  • Chemical anchor (dia. 12 mm: LMAS M10-110) with AT-HP resin.
Installation

Use all the specified fasteners. Multi-ply joists must be connected together so that they act as one single element.

  • ET248 - Skewed 45° hanger (right and left)
    ET248
  • ET248 - Skewed 45° hanger (right and left)
    ET248
  • ET260 - Timber Installation - Skewed 45° hanger (right and left)
    ET260 - Timber Installation
  • ET260 - Masonry Installation - Skewed 45° hanger (right and left)
    ET260 - Masonry Installation
  • ET260 - Plan View - Skewed 45° hanger (right and left)
    ET260 - Plan View
  • ET301 - Timber Installation - Skewed 45° hanger (right and left)
    ET301 - Timber Installation
  • ET301 - Masonry Installation - Skewed 45° hanger (right and left)
    ET301 - Masonry Installation
  • ET301 - Plan View - Skewed 45° hanger (right and left)
    ET301 - Plan View
  • Skewed 45° hanger (right and left)
  • Skewed 45° hanger (right and left)
  • Skewed 45° hanger (right and left)